We hope that the development of the dielectric withstand tester, Portable Oil Purifier, turbine oil purifier system industry in China will be different because of our existence. In order to establish a more excellent brand image, we continue to improve the quality of our services and bring our customers an excellent experience. The company has spared no effort in internal management and market expansion, so that the company's products are sold throughout the country and have been exported to many countries and regions. Due to reliable product quality, reasonable price, thoughtful service and timely supply, it has won the trust and praise of users.
1. Application
FUOOTECH produced and exported the FTDC-20A Transformer DC resistance rapid tester since 2005. After continuous improvement and upgrading based on the good suggestions from clients and absorbing the newest technology at home and abroad, FTDC-20A already becomes the newest product for transformer DC resistance test.
This 20A DC Resistance tester adopts new power supply technology, which has the characteristics of small size, light weight, large output current, good repeatability, strong anti-interference ability, perfect protection function and so on.
The whole test equipment is controlled by a high-speed single-chip microcomputer, with a high degree of automation, with automatic discharge and discharge alarm functions. The instrument has high test accuracy and easy operation, and can realize the rapid measurement of transformer direct resistance.
2. When To Measure Winding Resistance?
1). Risk of damage is significant whenever a transformer is moved. This is inherent to the typical transformer design and modes of transportation employed. Damage can also occur during unloading and assembly. The damage will often involve a current carrying component such as the LTC, RA switch or a connector.
Damage to such components may result in a change to the DC resistance measured through them. Hence, it is recommended that the DC resistance be measured on all on-load and off-load taps prior to energizing.
2). If the transformer is new, the resistance test also serves as a verification of the manufacturers work. Installation measurements should be filed for future reference.
3). At routine (scheduled) Transformer Maintenance: routine maintenance is performed to verify operating integrity and to assure reliability. Tests are performed to detect incipient problems.
3. Technical Parameters
Items |
Technical parameters |
Notes |
Measuring current |
<20mA,1A,2.5A,5A,10A,20A |
|
Measuring range |
100μΩ~1Ω (20A) |
Accuracy: ±(0.2%+2) |
|
10Ω-20KΩ (<20mA) |
Accuracy: ±(0.5%+2) |
Minimum resolution |
0.1μΩ |
|
Display |
LED Display |
The resistance shows 4 significant digits |
data storage |
1000 list |
|
Working environment |
Environment temperature: 0℃~40℃ |
|
Power supply |
AC 220V±10V, 50Hz±1 Hz |
Safety tube 10A |
Maximum power |
1000W |
|
Dimension |
400×225×350(mm) |
|
Weight |
Tester box: 15.1KG, Line box: 5.75KG |
|
4. Features
1). The whole machine is controlled by high-speed single chip microcomputer, with high degree of automation and easy operation.
2). The instrument adopts new power supply technology, with many current ranges and wide measurement range, which is suitable for DC resistance measurement of large and medium transformers.
3). The protection function is perfect, which is reliable to protect the impact of back EMF on the instrument, and the performance is more reliable.
4). Intelligent power management technology, the instrument always works in the minimum power state, which can effectively save energy and reduce heating.
5). Sound discharge alarm, clear discharge indication, reduce operation mistakes.
6). Fast response.
7). 320x240 ultra small pixel 65K true color liquid crystal,
8). The instrument is equipped with RS232 and USB interface, which can communicate with computer and store in U disk.
9). The instrument has its own calendar clock and power down memory, which can store 1000 groups of test data and can be consulted at any time
5. Stocks at office
6. Packing, Delivery, Shipping and Payment
7. Certificates
8. Fault inspection and Trouble-shooting
Phenomenon |
Reason |
Solution |
|
1 |
Green light don't turn on when power switch connected |
Current lines open a circuitPower fuse fusing |
Change power lines |
2 |
Red light don't turn on when push the red button |
Pressure regulating potentiometer didn't return to 0 |
Potentiometer return to 0 |
3 |
Red light turns on when push the red button, while raise voltage, red light turns off, red light turns on |
High voltage output terminal tester has short circuit |
Check the output electriccable. Check the tested products |
4 |
During raise voltage, red light turns off, green light turns on. |
Tester discharge or break-down over voltage or over current protection movement |
Check the tested products reset setting valu |
Welcome to contact us for any inquiry and cooperation by email, phone, WhatsApp, etc.
Facing the severe challenges of the market, we will discuss the solution of 50Hz 3 Phase DC Winding Resistance Test Set 20A for Transformer Testing with you in order to win the business opportunities. We will make your dream come true. Our company has always insisted on making customers feel at ease with pragmatic work, meeting customer requirements with innovative technology, achieving a win-win situation with honesty, and helping users overcome technical difficulties. We will strive to build a company with a complete system, leading technology, efficient operation, scientific management and good efficiency, to build international competitiveness and continuous innovation ability.
Hot Tags: 20a transformer winding dc resistance tester, China, suppliers, manufacturers, customized, price, in stock, buy discount, winding resistance measurement system, pilot frequency dielectric loss tester, sf6 multi analyser, transformer oil regeneration system, mega insulation resistance tester, oil filtration for transformer